location
Home / Products & Cases / Details

Hook Overhead Crane

392edbf7ac011c3a8846789106e45778.webp
Authentication mark:
CCC
CE
The following options can be selected:
Lifting capacity:
  • 5t
  • 10t
  • 16t
  • 20t
  • 30t
  • 50t
  • 75t
  • 100t
  • 125t
  • 150t
Lifting height:
0m
30m
Span:
0m
31.5m
Voltage/Hertz:
Job level:
  • A5
  • A6
  • A7
  • A8
Sling available:
  • available_img available_img_active Lifting hook
Apply: Double girder hook overhead crane is suitable to work in factories, warehouses and freight yards where the ambient temperature is-10oC-40oC and the relative humidity is not more than 85%.
submit
consult
  • Product Overview
  • Application Scenario
  • Certificate

Double girder hook overhead crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder.Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble and maintenance the crane move device, another side is prepare for the assemble of the trolley conductor device.There are full field of view Cabin suspend under the main girder, there are joint control desk or single control box packed within the Cabin, assemble the sidelong ladder between the Cabin and moving table, The main girder joint with the two side end carriage which with the joint point in the middle.

Features:

1. Double girder hook overhead crane is mainly used in various indoor workshops. According to different utilization levels and load conditions, it is divided into two working levels: A5 and A6.

2. The entrance of the cab can be 3 ways: side entrance, end entrance and top entrance.

3. The driver's cab can be installed on the left or right.

4. The crane power supply is from the safety conductor bar or angle steel, which can be on the opposite side of the driver's cab or on the same side of the driver's cab.

5. The operation of the crane is completed in the driver's cabin.